Dispatch reports that the IP wants to proceed with the construction of the bridge, which "implicates occupation" of ecological areas. The work seeks to reconstruct the link between Frontier and Alter do Chão, destroyed in 2022.
Dispatch reports that the IP wants to proceed with the construction of the bridge, which "implicates occupation" of ecological areas. The work seeks to reconstruct the link between Frontier and Alter do Chão, destroyed in 2022.