Troilus triples value to $3.2B, closes in on funding
6 Articles
6 Articles
Troilus Reports Updated Technical Report Following Completion of Basic Engineering, Delivering After-Tax US$3.2 Billion NPV5%, 22% IRR, and Cashflow of US$6.9 Billion at Base Case Gold Price of US $3,600/oz
MONTREAL, Sept. 09, 2026 (GLOBE NEWSWIRE) -- Troilus Mining Corp. (“Troilus” or the “Company”) (TSX: TLG; OTCQX: CHXMF; FSE: CM5), is pleased to report the results of an updated NI 43-101 Technical Report (the “Technical Report”) for the gold-copper Troilus…
Troilus Mining Corp. (TSX:TLG) - Updated Study Delivers Bigger Reserve, Longer Life, Higher Confidence - Research Portal
Troilus Mining (TLG) reported the results of an updated technical report on its 100%-owned Troilus Au-Cu project in Quebec, incorporating the recently completed Basic Engineering program. The report outlines a 26-year, 50,000 tpd open pit operation generating an after-tax NPV5% of US$3.2B, a 22% IRR, and a 3.6-year payback at base case prices of US$3,6000/oz Au, US$5.00/lb Cu, and US$50/oz Ag, with cumulative after-tax cash flow of US$6.9B over …
Coverage Details
Bias Distribution
- 80% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium











