5 Articles
5 Articles
Avalanche flooded hydroelectric dam under construction in Nepal A video of the Rasuwa district in Nepal showed the rupture of a hydroelectric dam under construction on Wednesday (August 26th). More than 1,000 people were missing in the Himalayan country and in neighboring China after a mass of ice, mud and rock broke out on a mountain river, triggering a catastrophic storm. The local media estimated the number of dead in 359 with dozens of bodie…
The violent flood and massive landslide between Nepal and Tibet leaves more than 350 dead and 1,400 missing
The commander of the Fire Department of Loures warns of the difficulties of relief operations in Nepal, a country with poor infrastructure and limited means to respond to the dimension of the tragedy. In the antenna of SIC News, Ricardo Correia highlights the lack of adequate equipment, the accesses destroyed by the floods and the instability of the land, defending the need for specialized international assistance.
The first disaster came almost without warning. Within 30 minutes, the Trishuli River rose by up to nine meters, as a huge torrent of water, mud, ice and rocks… Nepal – Tibet: Fears of a second strike – The 30 minutes of destruction and the new “dam” that threatens - ΙΝΑΦΤΕΜΟΠΟΡΙΚΙ
Coverage Details
Bias Distribution
- 67% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium









