institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

In Gèze, the New Holding Basin Must Reduce Waste Water Discharges by "10%"

Summary by Made in Marseille
A fifth holding basin connected to the Marseille sewerage system has just been inaugurated in Gèze (15th). An operation of 26 million euros to reduce waste water discharges to the environment by 10%. In the Nord de Marseille neighbourhoods, just opposite the multimodal station of Gèze (15th), is now hiding a small underground cathedral. A retention basin of 10 500 m3 realized to contain heavy rainfall, prevent floods, but also lighten the sewera…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

A fifth holding basin connected to the Marseille sewerage system has just been inaugurated in Gèze (15th). An operation of 26 million euros to reduce waste water discharges to the environment by 10%. In the Nord de Marseille neighbourhoods, just opposite the multimodal station of Gèze (15th), is now hiding a small underground cathedral. A retention basin of 10 500 m3 realized to contain heavy rainfall, prevent floods, but also lighten the sewera…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Made in Marseille broke the news in on Friday, July 4, 2025.
Sources are mostly out of (0)