Expand CESPT Sanitary Renovation Works on the Coastal Promenade of Playas De Tijuana
4 Articles
4 Articles
Tijuana, August 19.- With the replacement and relocation of 170 meters of pipe, the works of renovation of the sanitary network are progressing in the Coastal Paseo de Playas de Tijuana, reported the CEO of CESPT, Mónica Vega Aguirre. The works allowed to remove the damaged pipe and install a new line at a point with better access conditions. The previous location made it difficult to enter the staff and the necessary equipment to review and mai…
The project included the construction of three visitor wells to facilitate network maintenance; patching work is currently being carried out on the avenue
The project included the construction of three visitor wells to facilitate network maintenance; patching work is currently being carried out on the avenue
With the replacement and relocation of 170 meters of pipe, the works of renovation of the sanitary network in the Paseo Costero de Playas de Tijuana, reported the CEO of CESPT, Mónica Vega Aguirre. The works allowed to remove the damaged pipe and install a new line at a point with better conditions of ... The entrance To make it easier to fix the drainage, change pipes in Playas de Tijuana was first published in TJNews.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium








