Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Măsurile Din Energie, Prelungite De Guvern. Repornirea Reactoarelor De La Cernavodă Rămâne Incertă • Newsweek România

Summary by newsweek.ro
Prognoza debitului Dunării la intrare în tară nu oferă o perspectivă sigură de repornire a cel puțin unei unități la Centralei nucleare de la Cernavodă, în luna octombrie 2026, arată Executivul în nota de fundamentare a hotărârii, adoptate joi de Guvern.

15 Articles

Center

Interministerial Committee Bala - Cernavoda met on Thursday to take new decisions on hydrotechnical works aimed at ensuring the cooling of reactors from the nuclear power plant. After a period of interruption, the machinery of the Lower Danube Administration (AFDJ) and the Romanian Waters resumed the dredge in the area.

·Bucharest, Romania
Read Full Article
romaniatv.netromaniatv.net
Reposted by
replicaonline.roreplicaonline.ro
Lean Right

Romania prolongs the state of alert in energy. The Central of Cernavoda will remain shut down at the beginning of October. Romania imports at peak hours up to almost 2,000 MW. Article The state of alert in energy in Romania is prolonged. The Central of Cernavoda will remain shut down in October appears first in Romania TV.

Right

Romania remains alert for another 30 days, after the authorities have found that the energy and hydrological situation remains at a critical level. The decision was adopted by the National Committee for Emergency Situations, in the context of the sharp decline in Danube flows and the risks that lie ahead of the safe operation of the Cernavoda Nuclear Power Plant.

Read Full Article

The Danube flow forecast at entry into the country does not provide a safe prospect for restarting at least one Nuclear Power Plant unit from...

Read Full Article

The government has extended the safety measures in the electricity market for another month, in the context where Cernavode Nuclear Power Station remains shut down due to the low flow of the Danube. The measures can be applied by Transelectrica until October 30, 2026. The government estimates that, with lower temperatures, electricity consumption can [...]

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

REALITATEA.NET broke the news on Thursday, October 1, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal