Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Construction Phase Change Between Hartmannskreuz and AS Alsfeld-Ost

Since the end of July, extensive road construction work has been carried out on the B 62 or B 254 between the Hartmannskreuz near Alsfeld and the A5 Alsfeld-Ost junction. In total, the roadway of the two federal road sections is renewed on a length of 1.9 km. The two federal roads are characterized in the affected area by various road damage, such as cracks in asphalt, emaciations and sparrows. Therefore, a renewal of the damaged asphalt layers …

1 Articles

Center

Since the end of July, extensive road construction work has been carried out on the B 62 or B 254 between the Hartmannskreuz near Alsfeld and the A5 Alsfeld-Ost junction. In total, the roadway of the two federal road sections is renewed on a length of 1.9 km. The two federal roads are characterized in the affected area by various road damage, such as cracks in asphalt, emaciations and sparrows. Therefore, a renewal of the damaged asphalt layers …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

osthessen-news.de broke the news on Wednesday, September 9, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal