Published • loading... • Updated
Works in El Saucillo with an Investment of More than 5.7 Mdp.
Summary by centralnoticiasmx.com
1 Articles
1 Articles
The actions included replacement of drinking water network, concrete pavement and benefited a thousand inhabitants in Mineral de la Reforma. As part of the permanent program “En Concrete”, the municipal president of Eduardo Medecigo Rubio led the delivery of works of hydraulic paving and replacement of the drinking water network in the streets [...] El post Obras en El Saucillo with investment greater than 5.7 mdp. appeared first in Central MX N…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
