institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

With increased requirements from state, fast work on bridges is vital, says Grand Forks County engineer

Summary by Grand Forks Herald
GRAND FORKS – As the state increases inspection requirements for bridges during high-water events, Grand Forks County Engineer Nick West’s goal is to get as many bridges rehabilitated as soon as possible. The biggest goal is getting bridges off Classification A, which requires an inspection every 24 hours during flood events.  “The Category A, where we inspect every day — that is a problem,” West said. “To go to a bridge every single day and loo…

Bias Distribution

  • 100% of the sources lean Right
100% Right
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Grand Forks Herald broke the news in on Saturday, July 5, 2025.
Sources are mostly out of (0)