Published • loading... • Updated
Wire Bridge 'Swallowed' by Dam in Trás-Os-Montes Remains without Alternative.
Summary by O Minho
1 Articles
1 Articles
The Left Bloc (BE) wants to know what measures the Government will take to restore the wire bridge between Monteiros and Veral, which was submerged after the filling of the Alto Tâmega dam reservoir in the Vila Real district. Locals and mayors have been demanding the restoration of the wire bridge that connects the villages of Monteiros (Vila Pouca de Aguiar) and Veral (Boticas), which was submerged after Iberdrola began filling the dam's reser…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
