institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Windtech International - Mammoet to support Heerema with offshore installation for TenneT 2GW programme

Summary by Windtech-international.com
Mammoet has signed a contract to support Heerema Marine Contractors in the offshore installation of two topsides for TenneT’s 2GW programme. As part of the work scope, Mammoet will assist in floatover preparations by skidding the topsides from a heavy transport vessel onto Heerema’s newly built H-731 barge, using hydraulic skid shoes.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

windtech-international.com broke the news in on Friday, July 4, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.