institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Wind Farm Conversion in Elster - Less New Wind Turbines with More Power

Summary by mdr.de
In the Elster wind farm, old wind turbines are dismantled and replaced by stronger ones. Thus, much more electricity is generated with less surface area. The conversion, which began in 2023, is to be completed in August.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

In the Elster wind farm, old wind turbines are dismantled and replaced by stronger ones. Thus, much more electricity is generated with less surface area. The conversion, which began in 2023, is to be completed in August.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

mdr.de broke the news in on Friday, June 13, 2025.
Sources are mostly out of (0)