Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

F-47 Program Producing Test Aircraft, on Schedule for 2028 Flight

The Air Force says the jet may need an existing powerplant at first because NGAP engines are not expected for integration until 2030.

Summary by Military Times
The U.S. Air Force’s F-47 program has begun its engineering and manufacturing development phase and will fly in the coming years, a service official said.The program, described as “extreme teaming” with industry partners, entered the phase with “unprecedented maturity,” Gen. Dale White, director of Critical Major Weapon Systems, said in a Wednesday keynote address at an event in Dayton, Ohio.The engineering and manufacturing phase includes matur…

8 Articles

Future-oriented engines are expected to significantly increase the range of the U.S. Air Force by 2030. However, the tight schedule is causing problems. As the new fighter aircraft F-47 is already taking off in 2028, older engines have to start operating. (Read more)

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 83% of the sources are Center
83% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Defense Daily broke the news on Wednesday, July 29, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal