As of July 11, the Florida Keys Aqueduct Authority’s new drinking water pipeline is fully connected and flowing in Plantation Key. Crews have completed connecting the 34,362 feet of new drinking water pipe from Snake Creek Bridge to Julep Road. This includes six connection points linking the new pipeline to the existing system. Crews have […]