Walkway Renovation at Lake Phoenix Lasts Longer: that's the Reason
Summary by waz.de
2 Articles
2 Articles
In Dortmund, the construction time on the north side of Lake Phoenix is extended. Work had already been delayed by six weeks at the beginning, and further incidents were added.
Despite barriers, walkers and athletes are constantly on the road in the construction site on the north bank of Lake Phoenix. This has consequences.
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium