Vitézy Made an Important Announcement About the Belgrade-Budapest Railway Line
6 Articles
6 Articles
In early October, the railway line will be tested at full load, with trains running without passengers at speeds of up to 160 kilometers per hour.
The inspection of the train control system on the Budapest-Belgrade railway line has been successfully completed, allowing the line to begin full-load testing in early October. This step is crucial before the start of passenger traffic, on which a final decision will be made after the evaluation of the trial run, according to a Facebook post by Minister of Transport and Investment Dávid Vitézy.
According to Dávid Vitézy, the launch of passenger traffic on the railway line is already within sight, and the final decision on this can be made after the test is completed.
Dávid Vitézy made an announcement about the Budapest-Belgrade railway line, the final steps are coming - The minister discussed with all participants.
Passenger traffic may resume within the foreseeable future.
No safety-critical error was found in the train control system even during the most thorough testing. The post Vitézy: We are conducting a full load modeling test on the Budapest-Belgrade railway line first appeared on 24.hu.
Coverage Details
Bias Distribution
- 50% of the sources are Center, 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium











