Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Video. Progress on the Bridge over Crișul Repede From the Electrification of Cluj-Frontieră

Summary by Club Feroviar
A railway enthusiast presents a video recording from which one can observe the progress made in the construction of the railway bridge over Crișul Repede on the last section of the electrification of the Cluj Napoca – Border railway. The video recording (source https://www.youtube.com/@yannis-trains) filmed with a drone includes both the new railway bridge and the old bridge that will be demolished. The length of the lot is 46.74 km, and the con…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

A railway enthusiast presents a video recording from which one can observe the progress made in the construction of the railway bridge over Crișul Repede on the last section of the electrification of the Cluj Napoca – Border railway. The video recording (source https://www.youtube.com/@yannis-trains) filmed with a drone includes both the new railway bridge and the old bridge that will be demolished. The length of the lot is 46.74 km, and the con…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Club Feroviar broke the news in on Friday, September 5, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal