The signs already indicate: on the 15th of September they stop circulating heavy throughout the day. How will this be controlled? The VCI – Internal Beltway connects the A20 to the A28 on the side of the port, joining the Freixo Bridge to the Arrábida. On the side of Vila Nova de Gaia, covers A1 and A44, connecting the same bridges. It is one of the most problematic roads in the country, regarding the traffic. In the North, it is even the most p…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The signs already indicate: on the 15th of September they stop circulating heavy throughout the day. How will this be controlled? The VCI – Internal Beltway connects the A20 to the A28 on the side of the port, joining the Freixo Bridge to the Arrábida. On the side of Vila Nova de Gaia, covers A1 and A44, connecting the same bridges. It is one of the most problematic roads in the country, regarding the traffic. In the North, it is even the most p…