Var: Renovation Programme at Marie-Curie School in Brignoles
Summary by lemoniteur.fr
1 Articles
1 Articles
The first phase will begin in the fall of 2025 and will include the installation of protective grids on the windows overlooking the street, in order to enhance safety while maintaining natural ventilation during the summer months. A preau will also be built near the sports field to create a shaded area in the courtyard. In addition, the damaged part of the playgrounds will be replaced by a permeable and vegetated coating.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium