US$91K Bulawayo road construction material disappears - Zimbabwe Situation
Summary by Zimbabwe Situation
1 Articles
1 Articles
All
Left
Center
Right
US$91K Bulawayo road construction material disappears - Zimbabwe Situation
Source: US$91K Bulawayo road construction material disappears – The Southern Eye BULAWAYO City Council has filed a police report following the disappearance of road construction material worth over US$91 000 from the Transport and Infrastructural Development ministry’s depot in Kelvin Industrial area. The missing material include 300 drums containing Bitumen 70/100, Stable 60 and Medium-Curing cutback (MC30). The revelations of the missing mater…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium