Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Unstandard Building in Chambéry: How the A41 Bridge Was Demolished and Rebuilt in 3 Days

Summary by TF1 INFO
A bridge on the A41 motorway was replaced in 60 hours in Chambéry (Savoie). The new building, more resistant to earthquakes and fire, is expected to last a century. The construction site cost seven million euros. - Unstandard building in Chambéry: how the A41 bridge was demolished and rebuilt in 3 days (Transports).

2 Articles

Center

A bridge on the A41 motorway was replaced in 60 hours in Chambéry (Savoie). The new building, more resistant to earthquakes and fire, is expected to last a century. The construction site cost seven million euros. - Unstandard building in Chambéry: how the A41 bridge was demolished and rebuilt in 3 days (Transports).

Center

Discover the impressive construction site that took place this weekend, from 3 to 6 October in Chambéry. A bridge of the A41 motorway between Lyon and Annecy, too old, was completely removed and replaced by a new one. This unique operation of its kind at 7 million euros, called "60 hours chrono" mobilized 100 people. Back in images on this race against the watch.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ledauphine.com broke the news in on Monday, October 6, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal