institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Tuul Water Complex planned to be built with a $200-300 million loan

Summary by ikon.mn
Within the framework of the 24 mega projects for the development of Ulaanbaatar, the Tuul Water Complex is planned to be built on an area of 5,569 square meters in 2025-2032. The reservoir will be built with a foreign loan of 200-300 million US dollars. Currently, the capital's citizens use 100 percent of groundwater, or 185-225 thousand cubic meters of fresh water per day. By 2040, the city's water consumption will increase to 772,450 cubic met…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

Within the framework of the 24 mega projects for the development of Ulaanbaatar, the Tuul Water Complex is planned to be built on an area of 5,569 square meters in 2025-2032. The reservoir will be built with a foreign loan of 200-300 million US dollars. Currently, the capital's citizens use 100 percent of groundwater, or 185-225 thousand cubic meters of fresh water per day. By 2040, the city's water consumption will increase to 772,450 cubic met…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ikon.mn broke the news in on Friday, April 4, 2025.
Sources are mostly out of (0)