Published • loading... • Updated
Tunnel Construction on Corridor 5C Leaves Settlement Near Zenica Without Drinking Water
Summary by Sarajevo Times
1 Articles
1 Articles
Tunnel Construction on Corridor 5C Leaves Settlement Near Zenica Without Drinking Water
Bosnia and Herzegovina still has the fewest kilometers of highway in this part of Europe, although the construction of the Corridor Vc route through Bosnia and Herzegovina is one of the largest infrastructure projects. Construction sites are welcome, but they are not the headache that is often experienced by residents of settlements along the future […] The post Tunnel Construction on Corridor 5C Leaves Settlement Near Zenica Without Drinking Wa…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium