Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Transgas Allocates up to 108.9 Million Lei for the First Batch of Huedin-Lugaşu Gas Pipeline

The National Natural Gas Transport Society (SNTGN) Transgaz allocates between 96.17 million lei and 108.87 million lei, without VAT, for the realization of the first batch of natural gas transport pipeline Huedin - Lugasu, according to an announcement of participation published in the Electronic System of Public Procurement (SEAP).
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

5 Articles

Huedin–Lugașu gas pipeline: Transgaz seeks constructor for the first 35 kilometers, which pass through Poieni, Ciucea and NegreniTransgaz seeks constructor for the first 35 kilometers of Huedin–Lugașu gas pipeline, which pass through Poieni, Ciucea and Negreni, from Cluj County, in an estimated contract...

Read Full Article

Transgaz prepares works for the first batch of natural gas pipeline Huedin – Lugașu, contract ... More than 100 million lei for gas pipeline Huedin – Lugașu. Investment also arrives in BihorRead more Article More than 100 million lei for gas pipeline Huedin – Lugașu. Investment arrives and in Bihor first appears in Oradea live.

The National Society of Natural Gas Transport (SNTGN) Transgaz allocates between 96.17 million lei and 108.87 million lei, without VAT, to realize the first batch of natural gas pipeline Huedin – Lugasu, according to an announcement of participation published in the Electronic System of Public Procurement (SEAP), transmits Agerpres. The contract aims, in addition to the execution of [...]

The National Natural Gas Transport Society (SNTGN) Transgaz allocates between 96.17 million lei and 108.87 million lei, without VAT, for the realization of the first batch of natural gas transport pipeline Huedin – Lugașu, reports Agerpres, reading the notice of participation published in the Electronic System of Public Procurement (SEAP). The new pipeline will have a length of [...] Article Transgaz allocates 109 million. lei for the first batc…

Read Full Article

The National Natural Gas Transport Society (SNTGN) Transgaz allocates between 96.17 million lei and 108.87 million lei, without VAT, for the realization of the first batch of natural gas transport pipeline Huedin - Lugasu, according to an announcement of participation published in the Electronic System of Public Procurement (SEAP).

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

www.economica.net broke the news on Sunday, September 27, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal