Published • loading... • Updated
Track work to disrupt Cambridgeshire trains for 9 days
Summary by RailAdvent
2 Articles
2 Articles
Upgrades needed on ‘very busy’ section of Cambridgeshire rail line
Engineers will renew nearly 1km of track, replace six sets of points and renew old sleepers and ballast in the vicinity of Ely station, in Cambridgeshire, later this month. The post Upgrades needed on ‘very busy’ section of Cambridgeshire rail line appeared first on New Civil Engineer.
Track work to disrupt Cambridgeshire trains for 9 days
Engineering work will improve reliability for Ely passengers, with almost 1,000 yards of travel and six sets of points set to be replaced. Track work is taking place on the 25th/26th April as well as 2,3,4,9,10,16 and 17th May. Work will take place on the 21st and 28th June to…
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
