To Ensure the Continuity of the Mrica Hydroelectric Power Plant Supplying Electricity to Jamali, Pln Ip Is Conserving the Serayu Watershed.
Summary by viva.co.id
1 Articles
1 Articles
This effort also strengthens the strategic function of the Mrica Reservoir as a flood controller and clean energy infrastructure, namely the UBP Mrica Hydroelectric Power Plant.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium