Published • loading... • Updated
Titan Mining Receives Financing Interest of up to US$120 Million from U.S. EXIM Bank for Kilbourne Graphite Project
Summary by The Hamilton Spectator
3 Articles
3 Articles
Reposted by
The Hamilton Spectator
Titan Mining Receives Financing Interest of up to US$120 Million from U.S. EXIM Bank for Kilbourne Graphite Project
GOUVERNEUR, N.Y., Oct. 07, 2025 (GLOBE NEWSWIRE) -- Titan Mining Corporation (TSX:TI, OTCQB: TIMCF), (“Titan” or the “Company”) an existing zinc concentrate producer in upstate New York and an emerging natural flake graphite producer, is pleased to announce that the…
·Niagara Falls, Canada
Read Full ArticleTitan Mining announces $120m financing interest from EXIM for graphite project
Titan Mining Corporation has announced that the Export-Import Bank of the United States (EXIM) has shown interest in providing up to $120m in financing.The post Titan Mining announces $120m financing interest from EXIM for graphite project appeared first on Mining Technology.
Coverage Details
Total News Sources3
Leaning Left2Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium

