Published • loading... • Updated
This Year, 11.7 Kilometers of Highway Stormwater Drainage Lines Will Be Installed in 19 Locations with the Capital City's Budget Funds.
Summary by ikon.mn
1 Articles
1 Articles
The Department of Geodesy and Water Structures (DWHS) plans to install 11.7 km of road storm water drainage lines in 19 locations this year with the capital city's budget investment. As part of the Selbe sub-center and Sharkhad sub-center work, 7.2 km of soil drainage lines will be installed in two locations, and a five-tiered reservoir with a capacity of 1.3 million cubic meters of water will be constructed in the 13th and 14th khoroos of Sukhb…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium