Top start for the photovoltaic farm on the wasteland of the former Honeywell site in Condé-en-Normandie (Calvados): so the elected representatives decided on 28 September 2026.
Top start for the photovoltaic farm on the wasteland of the former Honeywell site in Condé-en-Normandie (Calvados): so the elected representatives decided on 28 September 2026.