The hydraulic work that is executed on the bridge of the Pirayui stream, on Maipú Avenue of the city of Corrientes, entered this week in a new stage with the installation of a structure that seeks to expand the ability to drain the water and reduce the risk of flooding in one of the most busy sectors of the south of the capital. It is 35 concrete pipes of 2.50 meters in diameter, which will be distributed in six rows next to the current structur…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The hydraulic work that is executed on the bridge of the Pirayui stream, on Maipú Avenue of the city of Corrientes, entered this week in a new stage with the installation of a structure that seeks to expand the ability to drain the water and reduce the risk of flooding in one of the most busy sectors of the south of the capital. It is 35 concrete pipes of 2.50 meters in diameter, which will be distributed in six rows next to the current structur…