institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

The Urban Road Maintenance and Recovery Work in Paipa - Gobernación De Boyacá Is Progressing at Full Speed

In Paipa, the departmental government allocates 750 million pesos for the supply of hot asphalt mixture. Paipa, July 25, 2025. (UACP). In Paipa, the departmental government, through the strategy ‘So goes the Work’ of the Secretariat of Infrastructure, inspected the works that are being advanced on 23rd Street, between 17th and 23rd runs, to the main road. “We continue to visit the works throughout the department of Boyacá. Today from Paipa we ar…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

In Paipa, the departmental government allocates 750 million pesos for the supply of hot asphalt mixture. Paipa, July 25, 2025. (UACP). In Paipa, the departmental government, through the strategy ‘So goes the Work’ of the Secretariat of Infrastructure, inspected the works that are being advanced on 23rd Street, between 17th and 23rd runs, to the main road. “We continue to visit the works throughout the department of Boyacá. Today from Paipa we ar…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Gobernación de Boyacá broke the news in on Saturday, July 26, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.