The story behind that surprise blockage of the Springwater Corridor path
Summary by BikePortland.org
1 Articles
1 Articles
All
Left
Center
Right
The story behind that surprise blockage of the Springwater Corridor path
A work crew hired by ODOT blocking the Springwater Corridor path just south of the Ross Island Bridge. Inset: The homemade sign that appeared on the path after BikePortland contacted ODOT. (Photos: Sent in by readers) A contractor hired by the Oregon Department of Transportation to do work on the McLoughlin Viaduct in southeast Portland near the Ross Island Bridge has blocked the Springwater Corridor path several times. That’s not a big deal, ex…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium