Published • loading... • Updated
The Mataianxi Bridge Access Road Will Open on the 10th, with Access Limited to Small Vehicles and Disaster Relief Vehicles.
Summary by 大纪元 Epoch Times
1 Articles
1 Articles
The Mataian Creek Bridge in Hualien was destroyed on September 23. After more than two weeks of repair work, Minister of Transportation Chen Shih-kai visited the site again on the 9th and said that with the full mobilization of the Highway Bureau to work day and night, the construction progress of the culvert access road has been greatly advanced. It is expected to be open to traffic before 3:00 p.m. on October 10. In the first phase, small cars…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium