The flooded intersection of Borowskiego and Dąbrowskiego Streets, which turned into a lake during every heavy downpour, will soon be a thing of the past. The City Hall has announced a tender for the development of design documentation for the construction of a retention reservoir, which will be built on a municipal plot at 41 Borowskiego Street. The future contractor will prepare two investment options: one with a surface parking lot or an open …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The flooded intersection of Borowskiego and Dąbrowskiego Streets, which turned into a lake during every heavy downpour, will soon be a thing of the past. The City Hall has announced a tender for the development of design documentation for the construction of a retention reservoir, which will be built on a municipal plot at 41 Borowskiego Street. The future contractor will prepare two investment options: one with a surface parking lot or an open …