The electrification of the Moldovan Railway (CFM), which will allow trains to run at a speed of 140 km/h, is planned for 2030. At the same time, the construction of the first European-gauge railway line on the Ungheni - Chisinau segment will begin in 2027, after the completion of the feasibility study this year, announced Deputy Prime Minister Vladimir Bolea, Minister of Infrastructure and Regional Development, on the ÎN CONTEXT show on Moldova …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The electrification of the Moldovan Railway (CFM), which will allow trains to run at a speed of 140 km/h, is planned for 2030. At the same time, the construction of the first European-gauge railway line on the Ungheni - Chisinau segment will begin in 2027, after the completion of the feasibility study this year, announced Deputy Prime Minister Vladimir Bolea, Minister of Infrastructure and Regional Development, on the ÎN CONTEXT show on Moldova …