Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

The Court of Auditors Notes an Overcost of 20 Million for Trains that Could Not Fit Through the Tunnels of Cantabria and Asturias, Although Transportes Denied It

Summary by El Mundo
Renfe's order for 200 million euros to renew its fleet of metric width for Asturias and Cantabria with trains whose dimensions invalidated them to cross the...

3 Articles

Right

The Court of Auditors has uncovered an overrun of 19.4 million euros in Renfe’s purchase of metric width trains, after the public company included technical specifications that proved to be incompatible with the own routes through which these trains were to be used. This is reflected in the report on the monitoring of Renfe’s recruitment for the financial years 2020-2024. The report has analysed how Renfe’s contracts were prepared, awarded and e…

Read Full Article
Lean Right

Renfe's order for 200 million euros to renew its fleet of metric width for Asturias and Cantabria with trains whose dimensions invalidated them to cross the...

·Madrid, Spain
Read Full Article

The monitoring body censores "impossible" technical requirements that could have been resolved by looking at the database

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

El Mundo broke the news in Madrid, Spain on Friday, May 29, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal