The press department of the NZDTG reported that the construction of the extension of the 63rd general education school located in the 23rd khoroo of Khan-Uul district is 60 percent complete. The building, which is being implemented with the capital's budget investment, is a two-story, four-block building with an area of 5,204.0 m2, with dimensions of 18x42m, 60x18m, 30x21m, and 4.5x30 meters. As of today, the construction of the building frame…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The press department of the NZDTG reported that the construction of the extension of the 63rd general education school located in the 23rd khoroo of Khan-Uul district is 60 percent complete. The building, which is being implemented with the capital's budget investment, is a two-story, four-block building with an area of 5,204.0 m2, with dimensions of 18x42m, 60x18m, 30x21m, and 4.5x30 meters. As of today, the construction of the building frame…