The Dieppois were delighted to have been able to borrow the Colbert Bridge of Dieppe on July 8, 2026. For six months they had been waiting for this moment. The iron riveted bridge had left for restoration in 2024 and the resumption of its mechanism imagined in 1889 proved to be a puzzle. Both parts of the city Jehan Ango are gathered but the period of running begins.
The Dieppois were delighted to have been able to borrow the Colbert Bridge of Dieppe on July 8, 2026. For six months they had been waiting for this moment. The iron riveted bridge had left for restoration in 2024 and the resumption of its mechanism imagined in 1889 proved to be a puzzle. Both parts of the city Jehan Ango are gathered but the period of running begins.