The Bridge of the Mureni Tunnel Has Been Reached. with Speed the Trains Will Travel Along the Bridge Brašov
2 Articles
2 Articles
The crossing of the Mureni tunnel, an essential stage in the process of modernising the Brašov - Sighšioara, part of the Rin-Dunáre Corridor, was completed, announced CFR Wednesday...
The National Railway Company "CFR" S.A. announces the completion of the Mureni Tunnel, with a total length of 740.44 meters. This is an essential stage in the modernization process of the Brașov–Sighișoara railway line, part of the Rhine–Danube Corridor, designed for the movement of trains with a maximum speed of 160 km/h. The Mureni Tunnel, located between the Mureni stop and the Vânători station, Mureș County, has a total length of 740.44 m, c…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium