Skip to main content
See every side of every news story
Published loading...Updated

Tennet Selects Lelystad Power Plant for Power Outage Recovery

Summary by rd.nl
In the event of a major power outage, a gas-fired power plant in Lelystad will be required to restart the electricity grid in central Netherlands starting in 2028. High-voltage grid operator TenneT reports that energy company Engie has won a tender to use the Maxima plant for this purpose until at least 2036.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

In the event of a major power outage, a gas-fired power plant in Lelystad will be required to restart the electricity grid in central Netherlands starting in 2028. High-voltage grid operator TenneT reports that energy company Engie has won a tender to use the Maxima plant for this purpose until at least 2036.

·Apeldoorn, Netherlands
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

rd.nl broke the news in Apeldoorn, Netherlands on Thursday, January 22, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal