Published • loading... • Updated
Tender phase begins for Alexandria lagoon
Summary by The Hamilton Spectator
3 Articles
3 Articles
+2 Reposted by 2 other sources
Tender phase begins for Alexandria lagoon
In November 2025, the Township of North Glengarry and EVB Engineering issued a prequalification document for companies who wanted to bid on the construction of the Alexandria lagoon expansion project. Five contractors met the prequalification requirements proposed and will be…
·Hamilton, Canada
Read Full ArticleCoverage Details
Total News Sources3
Leaning Left2Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium


