Published • loading... • Updated
South Shore Line’s West Lake Corridor start set for mid-March
Summary by Chicago Tribune
1 Articles
1 Articles
South Shore Line’s West Lake Corridor start set for mid-March
St. Patrick’s Day has been chosen as the tentative date for a ribbon-cutting for the South Shore Line’s new West Lake Corridor route. The route, to be called the Monon Corridor, will transport riders between the Hammond Gateway station in north Hammond and Dyer. The east-west route that South Shore trains have followed for more than a century will be referred to as the Lakeshore route. “I can’t think of a better St. Patrick’s Day celebration tha…
·Chicago, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
