Yucky sand and debris that was removed from the lake at the Church Street Boat Ramp has been deposited along the land just north of the Greenwood Beach. Dredging at the ramp at 1647 Sheridan Road is expected to be complete by the end of the week. The work is done annually to deepen the boat launch area so that large boats can be put into the lake. Kovilic Construction Co., the contractor, is being paid $315,000 for the work. (Photo by Richard Ca…