Published • loading... • Updated
Signal Work Scheduled on MO 47 in Warrenton | Missouri Department of Transportation
Summary by modot.org
1 Articles
1 Articles
Signal Work Scheduled on MO 47 in Warrenton | Missouri Department of Transportation
Signal Work Scheduled on MO 47 in Warrenton Visitor (not verified) Fri, 08/29/2025 - 14:20 HANNIBAL – Weather permitting, the week of September 15, contractor crews will begin work to relocate the cabinet for a signal light in Warren County at the intersection of Missouri Route 47 and the eastbound off-ramp of Interstate 70 in Warrenton. Work will include removing the existing signal cabinet currently located in the island at the eastbound I-70 …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium