institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Seraphim and Spic-Zuma Energy Start Replacement of Solar Panels in Two Photovoltaic Parks

The companies Seraphim and SPIC-Zuma Energía announced the start of a joint project for the supply and installation of solar modules in the photovoltaic solar parks Santa Maria, Chihuahua, and Orejera, Sonora. The cooperation agreement envisages an initial supply of 12 megawatts (MW) in solar modules, which includes critical spare parts to maintain technical coherence with the original design of both plants.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The companies Seraphim and SPIC-Zuma Energía announced the start of a joint project for the supply and installation of solar modules in the photovoltaic solar parks Santa Maria, Chihuahua, and Orejera, Sonora. The cooperation agreement envisages an initial supply of 12 megawatts (MW) in solar modules, which includes critical spare parts to maintain technical coherence with the original design of both plants.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Energia A Debate → Energía a Debate es un espacio de análisis y opinión sobre temas energéticos, en broke the news in on Thursday, July 24, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.