Saskatoon’s third flood control project complete – Water Canada
Summary by watercanada.net
1 Articles
1 Articles
All
Left
Center
Right
Saskatoon’s third flood control project complete – Water Canada
Residents in Saskatoon’s Avalon neighbourhood can look forward to reduced flood risk as the City of Saskatoon officially opens the newly upgraded Weaver Park dry storm pond. The park is open to the public, offering both improved flood protection and a revitalized recreational space. This is the third project completed under the City’s Flood Control Strategy (FCS), which was approved by City Council in 2018. This spring, construction will start o…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium