Published • loading... • Updated
Sanitary sewer construction in Ambler likely to result in loud noise and possible vibrations - Around Ambler
Summary by aroundambler.com
1 Articles
1 Articles
Sanitary sewer construction in Ambler likely to result in loud noise and possible vibrations - Around Ambler
As of March 12th, a contractor for Bucks County Water & Sewer Authority began installing a sanitary sewer force main by jack and bore underneath the SEPTA train tracks toward the Ambler Borough Wastewater Treatment Plant. If you aren’t familiar, jack and bore, or horizontal auger boring, is a trenchless construction method used to install underground utilities such as pipes and casings, beneath infrastructure like railroads and roads without dis…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
