See every side of every news story
Published loading...Updated

SA Power Networks hit restoration milestone - Utility Magazine

Summary by Utility Magazine
Image: SA Power Networks The towns of Hawker and Leigh Creek have been reconnected to South Australia’s electricity network, after a destructive storm swept through the region in October 2024.  This milestone on Saturday 15 February 2025 marks the end of a significant effort to reconnect communities impacted by the storm – which caused damage surpassing the state-wide blackout event in 2016 and saw 32 transmission towers downed and widespread ne…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

All
Left
Center
Right
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Utility Magazine broke the news in on Monday, February 17, 2025.
Sources are mostly out of (0)