Road construction work has been incomplete for the past three months in Bairagpura, Lane No. 3, in Mathura's Municipal Corporation Ward No. 17. After laying the sewer and pipeline, the road was not repaired or renovated, leaving the entire street in a state of mud, filth, and waterlogging. At 1 p.m., residents allege that despite repeated complaints, the problem remains unresolved. According to local residents, after the sewer and pipeline work …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Road construction work has been incomplete for the past three months in Bairagpura, Lane No. 3, in Mathura's Municipal Corporation Ward No. 17. After laying the sewer and pipeline, the road was not repaired or renovated, leaving the entire street in a state of mud, filth, and waterlogging. At 1 p.m., residents allege that despite repeated complaints, the problem remains unresolved. According to local residents, after the sewer and pipeline work …