amaBhungane | Revealed: Maziya’s Share in Tainted IDT Oxygen Tender ‘Left as It Was’ – Despite Health Minister’s Promise
Despite corruption allegations and a R836-million budget surge, Maziya's R152-million hospital oxygen contract remains with the Independent Development Trust amid legal and procedural concerns.
4 Articles
4 Articles
amaBhungane | Revealed: Maziya’s share in tainted IDT oxygen tender ‘left as it was’ – despite health minister’s promise
A R152-million contract with the Maziya On-Site Gas Systems joint venture to supply hospital oxygen plants has quietly remained with the Independent Development Trust – despite public assurances from Minister of Health Aaron Motsoaledi that the entire tender had been taken away from the IDT.
Hospital oxygen plant tender unchanged despite assurances - Juta MedicalBrief
Despite public undertakings from Health Minister Aaron Motsoaledi to remove the tainted R836m hospital oxygen plan tender from the Independent Development Trust (IDT), the Maziya joint venture’s contract remains firmly as it was, writes Azarrah Karrim for amaBhungane in Daily Maverick. A R152m contract with the Maziya On-Site Gas Systems joint venture to supply the plants is still with the IDT — despite the Minister promising that the entire ten…
Revealed: Maziya’s share in tainted IDT oxygen tender ‘left as it was’ – despite health minister’s promise - AmaBhungane Centre for Investigative Journalism
A R152-million contract with the Maziya–On Site Gas Systems joint venture (JV) to supply hospital oxygen plants has quietly remained with the Independent Development Trust (IDT) – despite public assurances from health minister Dr Aaron Motsoaledi that the entire tender had been taken away from the IDT. Following reporting by amaBhungane and Daily Maverick, which raised numerous red flags about the IDT’s adjudication and prompted a PwC investigat…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium


